Tub-to-Shower Conversion in Richardson, TX

Richardson tub conversions tend to come from two very different owners. One is a landlord replacing a worn tub-shower in a rental between tenants. The other is a long-time owner of an older home turning a dated hall bath into something easier to use, often as part of a bigger remodel. The goals, the material choices and even the city programs that apply are different for each, so this page treats them separately.

Converting a tub in a rental property

Richardson’s housing is split almost evenly between owner-occupied homes and rentals (Census QuickFacts puts the owner-occupied rate at about 51%). For a rental bathroom, the conversion is a maintenance and durability decision first:

  • Fewer joints to fail: Every seam, caulk line and corner is a place for water to get in when the shower is not your daily responsibility. Simpler layouts with fewer niches and edges are easier to keep sound.
  • Parts you can replace: A standard valve trim, shower head and door hardware can be swapped quickly when something breaks between tenants.
  • Glass or curtain: A curtain rod costs little to replace; a fixed glass panel avoids a door hinge that loosens with heavy use. A hinged glass door has the most moving parts to maintain in a rental.
  • Easy-clean surfaces: Finishes and grout that survive move-out cleaning without staining.
  • Schedule: Plan the conversion for a vacancy, with the permit lead time built in.
Keep in mind who rents in your area. If your rental attracts families with young children, a tub in at least one bathroom may matter to them.

Fitting a conversion into a tenant turnover

A vacancy is the best time for a conversion, but only if the slow parts happen before the unit is empty:

  1. As soon as you know the move-out date: Schedule the site visit, so the scope and estimate are ready.
  2. Before move-out: Choose the shower system, glass and fixtures, and order anything with a lead time. Prepare the permit application, since Richardson requires before-and-after plans and a scope, and the permit must be approved and posted before work starts.
  3. When the unit is empty: Demolition, plumbing rough-in and the inspection, then waterproofing, tile or panels.
  4. Last: Glass, which is measured after the tile is finished, and the final inspection.
  5. Before the next tenant: A walkthrough, care instructions for the new shower, and photos for your records.

Converting a tub in an older Richardson home

Richardson’s housing is the oldest among Richardson, Plano, Allen, McKinney and Frisco: a median year built of 1986, with a large share of homes built before 1980 (Census ACS 2020–2024). In a home from the 1960s, 70s or early 80s, the hall-bath tub may be original to the house. That changes a few things about a conversion:

  • The old tub may be heavy. Older homes sometimes have cast-iron tubs, which usually have to be broken up to come out of a small bathroom, with the room protected first.
  • What is underneath is decades old. The drain, the subfloor and the wall behind the surround have had a long time to develop problems, so the estimate should explain how surprises will be handled.
  • The layout may be tight. Older hall baths are often compact, so a same-footprint conversion with good storage and a clear glass panel can make the room feel larger without moving walls.
  • It is a natural time to update the plumbing at the wall. With the tub out, the valve and the supply lines behind it are exposed.

For the condition questions that apply to existing showers in older Richardson homes (soft floors, failing pans, what sits behind tile), see our Richardson shower remodeling page.

Richardson’s Home Improvement Incentive Program

If the conversion is part of a larger remodel of your home, the City of Richardson’s Home Improvement Incentive Program may apply. According to the city:

  • Homeowners in single-family zoned areas are eligible (except those delinquent in taxes or other fees).
  • The project must involve reconstruction or remodeling of a single-family home, cost at least $20,000 and be completed within 24 months of project approval.
  • The homeowner must submit the application to Community Services before construction begins, provide a cost estimate and consent to periodic inspections.
  • The incentive is a one-time payment equal to 10 times the increase in city taxes resulting from the improvements.

A tub conversion alone may not reach the $20,000 threshold, but a full bathroom remodel that includes one may. Apply before any work starts: the city requires it. Details and the application are on the City of Richardson’s Home Improvement Incentive Program page. The city decides eligibility, and the city notes the incentive may have income-tax consequences, so check with your tax advisor.

Permits for a conversion in Richardson

Richardson requires a building permit for alterations that modify plumbing, with before-and-after plans and a written scope, and contractors must be registered with the city.

A tub-to-shower conversion changes the drain and the valve, so it is permitted work. The full explanation is on our Richardson shower remodeling page.

We pull the required permits and coordinate inspections.

Which conversion fits

Your situation Usually the right approach
Rental, worn tub-shower combo, vacancy coming Same-footprint conversion with simple, durable finishes
Older home, compact hall bath, you plan to stay Same-footprint conversion with an updated valve, storage niche and clear glass
Older home, larger remodel planned Conversion as part of a full bathroom remodel; check HIIP before starting
You want to keep the tub A shower or bathroom project instead

Talk through your Richardson conversion

Tell us whether it is a rental or your own home, how old the bathroom is and what you want instead of the tub, and we will outline the right conversion.
What happens next: a visit to see the bathroom, then a written scope covering removal, plumbing, the Richardson permit and finishes, timed around your vacancy or remodel plans.

    Tub-to-shower conversion Richardson TX with a modern shower and durable finishes

    Who does the work

    • In-house design and construction team
    • Certified General Contractor
    • $1 million in insurance coverage
    • NKBA affiliation
    • 500+ flooring and remodeling projects completed under Sami’s leadership
    • Six-time Best of Plano award winner (2015, 2016, 2017, 2018, 2020, 2023)
    • 0% financing available for qualified homeowners

    Finished bathrooms are in our project gallery, and samples are at the showroom, 2830 W. 15th St., Suite 1, Plano (Mon–Fri 11–5, Sat 11–4).

    Tub-to-shower questions from Richardson owners

    I own a rental. Should I convert the tub or just reglaze it?

    Reglazing refreshes the surface but keeps the tub; a conversion changes how the bathroom works. If tenants rarely use the tub and it is worn, a durable shower is often easier to maintain over time. If your renters are likely to be families, consider keeping a tub.

    Our tub is from the 1970s. Is it cast iron, and does that matter?

    It may be. A cast-iron tub is heavy and is usually broken up for removal, which takes protection and care in a small bathroom. It does not change the shower that replaces it.

    Does a tub-to-shower conversion qualify for Richardson’s incentive program?

    On its own it may fall below the $20,000 minimum. As part of a larger remodel it may qualify. Apply with the city before construction begins, because the program requires it.

    Do I need a permit?

    Yes. The conversion modifies plumbing, which Richardson permits as an alteration. We handle the permit and inspections.

    Can the work be scheduled between tenants?

    Plan it for a vacancy and allow for the permit lead time; share the turnover date at the first visit so the schedule can be built around it.