Kitchen Remodeling in Allen, TX

Most Allen kitchens were built during the city’s big growth decades, and most of the people cooking in them own the house and plan to stay. That shapes what a good kitchen remodel looks like here: fixing what a builder-era kitchen gets wrong for daily life, deciding whether to open it to the family room, and spending on the upgrades that still feel right ten years from now. This page walks through those decisions, what each kind of project involves, and how Allen’s permit rules apply.

The kitchens Allen homeowners are living with

Census estimates put the median year built for Allen homes at 2003. About a quarter of the housing went up in the 1990s and well over half after 2000 (U.S. Census Bureau, ACS 2020–2024 5-year estimates). Roughly seven in ten Allen homes are owner-occupied, the highest rate among Allen, Plano, Frisco, McKinney and Richardson (Census QuickFacts).

If your kitchen dates from the late 1990s or 2000s, you may recognize some of the things owners most often want to change in kitchens of that era:

  • Soffits above the upper cabinets, which waste space and date the room
  • Upper cabinets that stop short of the ceiling, with a dust shelf on top
  • Tile or laminate countertops, and a small island or none at all
  • A kitchen walled off from the family room, or open on only one side
  • Thin lighting: a single ceiling fixture or a few cans, with no under-cabinet light
  • Too few outlets where you actually work, and none on the island
Not every Allen kitchen has these, but they are the usual starting points for a remodel conversation.

Partial update or full renovation?

The most important decision is scope. It sets the budget, the schedule and the permit work.
Partial update Full renovation
Choose it when The layout works, but finishes feel dated Flow, storage or the connection to the rest of the house is the problem
Typical work Countertops, backsplash, cabinet refacing or replacement in place, lighting and fixtures, flooring New cabinet layout, island changes, moved sink or range, new circuits, possibly a wall opened
Plumbing and electrical Usually stays in place Often relocated or added, which brings permits and inspections
Best for A kitchen that is fundamentally sound A kitchen that does not fit how the household lives now
A partial update can still be substantial. Replacing soffits and cabinets on the same footprint, for example, changes the room a great deal without moving the plumbing.

Taking out the soffits: what is usually inside

Soffits, the boxed-in bulkheads above the upper cabinets, are the most common thing Allen owners want gone. They were not always decoration. Builders often used them to hide something:
Often inside a soffit What happens when the soffit comes out
Nothing (an empty box) It is removed, the ceiling is patched, and taller cabinets go in
A range hood or bath fan duct The duct is rerouted through the ceiling or wall, or a smaller section of soffit stays to hide it
HVAC supply duct Ductwork may be rerouted, or the soffit is rebuilt narrower over just the duct
Plumbing vent or drain from a bathroom above Usually hard to move; a short section of soffit or a cabinet “chase” may remain
Electrical wiring Rerouted, and the run is inspected
Nobody knows until a small inspection opening is cut or the soffit is opened. A good plan prices the “empty” case and explains in writing how a hidden duct or pipe will be handled.
What replaces the soffit:

  • Cabinets that run to the ceiling, with no dust shelf on top;
  • Stacked uppers: a standard cabinet with a shorter cabinet above it, often with glass doors, for seasonal items;
  • Crown molding to finish the top line;
  • A step stool drawer or pull-down shelves, so the highest storage is usable.

Opening the kitchen to the family room

Many owners of 1990s and 2000s homes want the wall between the kitchen and the family room gone. Before that decision is made, three questions need answers:

  1. Is the wall load-bearing? If it is, removing it requires a properly sized beam and support, not just demolition. Our wall removal and load-bearing wall removal pages explain how that work is approached.
  2. What is inside it? Plumbing vents, electrical runs and ductwork often pass through kitchen walls and have to be rerouted.
  3. What happens to the floor? When a wall comes out, the two rooms’ floors usually need to become one continuous floor. See flooring installation.

Adding or enlarging an island

Many 1990s and 2000s Allen kitchens have a small island, or none. Before adding one, check the space and what it needs to connect to:

Seating that is actually comfortable. The NKBA kitchen guidelines allow 24″ of width per seated diner, with knee space 18″ deep at a 30″ table-height counter, 15″ deep at a 36″ counter, and 12″ deep at a 42″ bar (NKBA Kitchen Planning Guidelines). Three stools need about six feet of seating edge.
Walkway space around it, so the island does not block the cook. How much space each aisle needs is explained on our Frisco kitchen page.
Power. Outlets on an island let you use small appliances there. On a slab, the wiring runs through conduit under the floor or through the island’s cabinet from a nearby wall.
Water or a cooktop on the island, if you want one. A sink on an island needs a drain run under the slab, and a cooktop needs ventilation above it, both bigger jobs than a plain island.

Changing appliances: gas, induction and the range hood

A 1990s or 2000s kitchen remodel is often when the cooktop changes too. Each change has a utility side:

  • Moving to induction or a larger electric range usually needs a dedicated 240-volt circuit of the right size, and enough capacity in the electrical panel.
  • Moving to gas means a gas line to the new location, with permits and inspections.
  • Upgrading the hood from a recirculating microwave to a ducted hood means a duct route to the outside, often through the space a soffit used to hide.
  • Very powerful hoods can trigger a make-up air requirement. Under the residential code, a hood able to exhaust more than 400 cubic feet per minute may need a way to bring replacement air into the house, depending on the home. The city’s plan review settles it.
  • A wall oven or microwave drawer changes the cabinet layout, so it is decided early.

Settle the appliance list before the cabinets are designed. Cabinets, circuits and gas lines are planned around it.

Flooring in an Allen kitchen remodel

Most 1990s and 2000s kitchens have their original tile or vinyl, often running into the breakfast area and laundry. Decide early:

  • Under the cabinets or up to them? New flooring usually goes under new cabinets in a full renovation, but up to existing cabinets in a partial update.
  • How far it runs. If the wall to the family room comes out, the kitchen floor should continue into the new open space.
  • Which material: porcelain or wood-look tile for water resistance, luxury vinyl for comfort and quick installation, or hardwood for warmth with more care around the sink.
  • Old tile removal: breaking out 1990s tile and its mortar is dusty work, and the slab underneath usually needs grinding and leveling.
Range wall with white shaker cabinets, gold pulls and a mosaic tile backsplash

What a kitchen remodel with us includes

A kitchen remodel with us can include any combination of:

  • Cabinets: replacement, semi-custom options or refacing
  • Countertops: templated, fabricated and installed for an exact fit
  • Tile backsplashes: see tile installation
  • Flooring coordinated with cabinets and appliances: see the most durable kitchen flooring options
  • Plumbing and electrical coordination for relocated sinks, appliances, lighting and outlets
  • Structural changes when a layout opens up

The full service overview, with design-build planning in detail, is on our main kitchen remodeling page.

How Allen’s permit rules apply to a kitchen remodel

The City of Allen’s message to homeowners hiring a contractor is direct: “Protect your property by ensuring your contractor has applied for and received a permit before starting work. Inspections are required.” (City of Allen, Residential Services)

Allen’s published exemptions are narrow, which matters for a kitchen:

  • Electrical: the exemptions cover items such as reinstalling plug receptacles (but not new outlets), replacing breakers of the required capacity in the same location, and minor repairs like replacing lamps. New circuits, added outlets and new lighting circuits fall outside them.
  • Plumbing: repairs are exempt only when they “do not involve or require the replacement or rearrangement of valves, pipes or fixtures.” Moving a sink, adding a pot filler or relocating the dishwasher rearranges pipes.
  • Structural: opening a wall changes the structure.

In practice, a finish-only update may involve little or no permit work, while a full renovation almost always does. We pull the required permits and coordinate inspections, so they are part of the plan rather than a surprise.

Upgrades that still make sense in ten years

For owners who plan to stay, these tend to matter more than trend-driven finishes:

  1. Storage that fits how you cook:
    deep drawers for pots, pull-outs, a pantry wall.
  2. Layered lighting:
    ceiling, task lighting under the upper cabinets, and island pendants.
  3. Outlets where you work,
    including on the island.
  4. Ventilation that actually clears the air: a range hood sized and ducted for the cooktop.
  5. Durable work surfaces and flooring that handle daily use and the occasional spill.
  6. Room for the household to grow: seating at the island, a landing zone for groceries.
Built-in cabinet nook with glass-front upper cabinets

Where the budget goes, and where to save

In a kitchen remodel, a few decisions drive most of the cost:
1. Moving things: relocating the sink, range or walls costs far more than replacing in place.
2. Cabinets: the number of boxes, the construction and the door style. Refacing sound boxes costs less than replacing them.
3. Countertops: the material and the number of seams and cutouts. Our Wylie kitchen page compares countertop materials.
4. Appliances, and the circuits, gas and ventilation they need.
Places to save without regret: keep the sink where it is; reface instead of replacing sound cabinets; use stock cabinet sizes where custom ones do not add function.

Places not to save: the range hood duct, outlets and lighting, and drawer hardware you use every day.

How the project runs

Every kitchen project starts with a visit and measurements, then design and material selection, a written scope and estimate, permits where required, demolition and rough-in, inspections, installation and a final walkthrough. The step-by-step version is on our kitchen remodeling process page.

Who does the work

  • In-house design and construction team
  • Certified General Contractor
  • $1 million in insurance coverage
  • NKBA affiliation
  • 500+ flooring and remodeling projects completed under Sami’s leadership
  • Six-time Best of Plano award winner (2015, 2016, 2017, 2018, 2020, 2023)
  • 0% financing available for qualified homeowners

Cabinet, countertop and tile samples are at our showroom, 2830 W. 15th St., Suite 1, Plano (Mon–Fri 11–5, Sat 11–4). Finished kitchens are in our project gallery.

Home remodeling questions from Frisco homeowners

Can you move the sink, range or other appliances?

Yes, layouts can be changed. Moving a sink or gas range relocates plumbing or gas lines, which in Allen means permitted work and inspections.

Do I need a permit for a kitchen remodel in Allen?

It depends on the scope. Allen’s exemptions do not cover new circuits, added outlets or rearranged plumbing, so most renovations need permits. A finish-only update may not. We confirm what applies and handle the permits.

Can the wall between the kitchen and family room come out?

Often, yes. If it is load-bearing, it needs a beam and support sized for the load, and anything running inside the wall has to be rerouted first.

How long does a kitchen remodel take?

It depends on the scope and on material lead times, especially for cabinets and countertops. You get a schedule with your written estimate.

How much does a kitchen remodel cost in Allen?

Cost follows scope: layout changes, cabinet type, countertop material and whether plumbing, electrical or walls move. Our kitchen remodeling cost guide explains the main drivers, and the estimate after a visit gives the real number.

What is inside our soffits, and can they come out?

Sometimes nothing; sometimes ducts, a plumbing vent or wiring. They can almost always come out, but whatever is inside has to be rerouted or kept in a smaller box. That is confirmed by opening a small section first.

Can we switch from electric to gas, or to induction?

Usually. Gas needs a new line and permits; induction or a larger electric range needs a dedicated 240-volt circuit and enough panel capacity.

How much room does island seating need?

NKBA recommends 24″ of width per person, with knee space 15″ deep at a standard 36″ counter.

Do you remodel small kitchens?

Yes. Small kitchens benefit most from better storage, layered lighting and a layout that removes wasted steps.

More general answers are in our kitchen remodeling FAQ.

Plan your Allen kitchen remodel

Tell us what does not work in your kitchen today (the layout, storage, the wall, the finishes) and we will outline the right scope, from a focused update to a full renovation.
What happens next: a visit to measure and talk through priorities, then a written scope and estimate that spells out the layout, the trades involved and the Allen permits.